20 documents, grouped by area
Every card opens the file directly, no sign-in needed. Versions and dates are shown on each card. All files also sit in one shared data room folder ↗.
Strategy & planning
4 documentsHow Teemly decides what to do and in what order.
8-Pillar Foundation
Framework · Sept 2026The first-principles operating model: eight forces that decide where Teemly creates, delivers, captures and compounds value.
Open document PDFStrategic Justification Dossier
27 pages · 101 sources · Nov 2026Why Teemly earns its place next to Teramind, ActivTrak and Hubstaff: problem, market, competition, product, compliance and governance, with every external claim sourced.
Open document PDFExecution Playbook
214 task cards · 5 waves · Oct 2026Every task ordered by dependency on the 8-Pillar loop, with context, step-by-step instructions, owner and definition of done.
Open document SheetTask Delivery Tracker
Live Google Sheet · updated weeklyTask IDs T-001 to T-214 with pillar, wave, owner, status and dependency checks, plus a progress dashboard.
Open sheetProduct
8 documentsWhat is being built, specified screen by screen.
Software Requirements Specification v1.0
Approved · Oct 2026 · ISO/IEC/IEEE 29148:2018Requirements for all four portals, ten modules, the Windows agent, security, non-functional requirements and traceability.
Open document PDFFunctional Specification
Screen by screen · Oct 2026Every screen, UI element, action and result across the four portals, with validation and role restrictions.
Open document PDFPhase 1 Product Scope
v1.0 · Vendor referencePortal-by-portal, module-by-module scope for Phase 1, including plan restrictions and the go-live plan.
Open document PDFUser Stories
Oct 2026Sprint-ready stories that the delivery team builds and tests against.
Open document PDFRole-Based Access Matrix
Super Admin · Admin · Manager · EmployeeExact permissions for every role across every module and screen, enforced in the UI and at the API.
Open document PDFSuper Admin Screen-by-Screen Spec
v0.2 · Oct 2026Module-ordered specification of the internal operations portal: organisations, billing, platform health and audit log.
Open document FigmaSuper Admin UI designs
59 screens in Figma · SA-00 to SA-09High-fidelity screens with states and a shared component library.
Open in Figma PDFPlatform Capabilities & Features v2
Investor reference · 2026Modules, the six intelligence reports, security, compliance, storage, billing and onboarding.
Open documentTechnology
3 documentsHow the engine and the Windows agent are designed and built.
Engine Architecture & R&D Plan
17 architecture views · Oct 2026C4 views of the Windows capture engine, the runtime event pipeline and latency budget, and a dated R&D plan.
Open document PDFEXE Agent Build Playbook
71 steps · 12 phasesZero-to-production plan for the agent, including security hardening, privacy and DPDP, packaging, signing and trust.
Open document PDFEXE Agent Developer Build Guide
Oct 2026The engineering guide agent developers work from, aligned with the SRS and the build playbook.
Open documentTrust & compliance
1 documentInfrastructure, security and the compliance roadmap.
Commercial
3 documentsThe business case and the numbers.
Seed Proposal
16 pages · Nov 2026The value built so far, the values Teemly builds by and the expertise behind it, then the ask: milestone-linked tranches and indicative partnership terms.
Open document PDFInvestor deck
July 2026The Teemly story: problem, product, market, model and plan.
Open document SheetFinancial model v3
Excel model · July 2026P&L, cash flow, burn, runway and unit economics with scenarios.
Open sheetTeam & operations
1 documentThe roles we are hiring for.
One operating model, five waves to go-live and beyond
Every task maps to one of the eight pillars of the 8-Pillar Foundation and is ordered by dependency: nothing starts before what it depends on. Click a pillar or a wave to see its tasks.
Waves
Tasks by pillar
Status from the live tracker, 2 Nov 2026.
All 214 tasks
Filter by wave, pillar, priority, owner or status. Click any task to open its instructions, definition of done and dependencies; task IDs inside a task jump to that task.
Showing 214 of 214 tasks
T-001Company OKRs & quarterly goalsFounder's Office & Strategy InputW0Mandatory DeepanNot started15-Nov-26
Why now. Every later task is ordered against a target. Without three to five written outcomes for Dec 2026 delivery and Jan 2027 launch, priorities drift and the team optimises locally.
Instructions
- Draft an OKR tree with one company objective per pillar that matters this quarter (Input, Transformation, Transmission, Conversion), each with 2-3 measurable key results.
- Deepan Cut to the 3-5 key results that decide success; name one owner per key result.
- Publish as a Doc and link each key result to the task IDs in this playbook.
- Team Review in the first weekly update of every month.
T-002Decision memosFounder's Office & Strategy InputW0Mandatory DeepanIn progress07-Nov-26
Why now. Two open decisions are the binding constraint on the whole build: the backend/agent stack (.NET native vs Python hybrid) and the delivery model (current vendor, another vendor, or in-house). Nothing in Engineering can be sequenced until both are decided.
Instructions
- Write one memo per decision: options, criteria (time to Dec delivery, Microsoft Store/signing fit, hiring market in Salem/Chennai, long-term cost, migration risk), scoring and a recommendation.
- Deepan Add context from vendor conversations; set a decision date no later than 7 Nov.
- Fold in evidence from the stack spike (T-006) and update the recommendation.
- Deepan Decide and record the decision at the top of the memo.
T-003Business plan & scenariosFounder's Office & Strategy InputW0Mandatory DeepanIn progress15-Nov-26
Why now. The ₹1.5 Cr from TD must last 12 months. A plan with base, upside and downside cases shows how many months of runway each scenario buys and which hires or vendor spends can flex.
Instructions
- Build a 12-month plan (Excel) with headcount, vendor, infrastructure and GTM costs, linked to milestones.
- Add three scenarios with different launch dates and conversion rates; label all estimates.
- Deepan Lock assumptions with Sathya.
T-004Risk registerFounder's Office & Strategy InputW0Mandatory DeepanNot started15-Nov-26
Why now. The plan has known single points of failure: stack decision, vendor progress, entity registration, pricing, and the C#/.NET hire. Naming them early lets you act before they slip.
Instructions
- Build a company risk register (likelihood, impact, owner, mitigation, trigger date), seeded with the gaps listed in this playbook.
- Deepan Rate each risk and assign owners.
- Team Review the top five every week.
Done when
Register live with owners; top five reviewed weekly.
Inputs needed
Founder's list of worries; vendor status; funding status.
Depends on
T-005Financial modelFundraising & Investor Relations InputW0Mandatory DeepanIn progress15-Nov-26
Why now. The financial model is how investors and the founder see runway. It must use one set of locked numbers so documents stop contradicting each other.
Instructions
- Build P&L, cash flow, burn and runway with unit-economics tabs and scenario toggles; label all estimates.
- Sathya Validate accounting treatment.
- Deepan Lock assumptions.
T-006Stack evaluationEngineering InputW0Mandatory KrishnaIn progress07-Nov-26
Why now. The stack is a technology input that every engineering task depends on. A one-week spike replaces opinion with evidence: build the same thin slice (agent event capture to API to stored event) in .NET and in the Python hybrid.
Instructions
- Write both thin slices in the code workspace; measure footprint, effort and Windows packaging fit; document migration risk.
- Krishna Run the agent slice on a real Windows machine.
- Feed results into the decision memo (T-002).
T-007Budget & burn trackerFinance & Accounts InputW0Mandatory DeepanNot started15-Nov-26
T-008Incorporation & compliance calendarLegal & Company Secretarial InputW0Mandatory SathyaIn progress15-Nov-26
Why now. The new Teemly entity is the root dependency. Share allotment to TD and Naveen, GST invoices, customer contracts, the code-signing certificate, Partner Center and trademark filing all need it.
Instructions
- Build the incorporation checklist and post-incorporation compliance calendar.
- Sathya File and complete registrations.
T-009Cap table & dilution scenariosFundraising & Investor Relations InputW0Mandatory DeepanIn progress15-Nov-26
Why now. Shares can only be allotted once the new Teemly entity exists and the cap table is final. Introducer equity must stay structurally separate from investor and operating equity.
Instructions
- Build the cap table with pre/post-money, ESOP pool and dilution scenarios, introducer stake on its own line.
- Sathya Validate against the shareholding pattern and filings.
T-010Tax, GST, TDS, payroll, auditFinance & Accounts InputW0Mandatory SathyaNot started15-Nov-26
Why now. Statutory compliance for the new entity (GST, TDS, payroll, audit) is non-negotiable and has fixed dates.
Instructions
- Build compliance calendar and document checklists.
- Sathya Execute and file.
T-011Board resolutions & minutesLegal & Company Secretarial InputW0Mandatory SathyaNot started15-Nov-26
Why now. Share allotment and bank mandates require board resolutions.
Instructions
- Draft resolutions, minutes, registers.
- Directors Sign; Sathya files.
T-012Term sheet & SHA reviewLegal & Company Secretarial InputW0Mandatory DeepanIn progress15-Nov-26
Why now. Terms signed now shape control and future rounds.
Instructions
- Plain-language summary and issue list.
- Counsel Negotiate and finalise.
T-013Vendor & developer agreementsLegal & Company Secretarial InputW0Mandatory DeepanNot started15-Nov-26
Why now. Without written IP assignment, Teemly may not own the code its vendors write. This must be signed before more code is delivered.
T-014Employment documentsLegal & Company Secretarial InputW0Mandatory DeepanNot started15-Nov-26
T-015Hiring plan & org designPeople & Talent (HR) InputW0Mandatory DeepanIn progress15-Nov-26
Why now. People are the binding input for the agent build. Investors also asked for the hiring plan.
T-016Use of funds & hiring planFundraising & Investor Relations InputW0Mandatory DeepanIn progress15-Nov-26
Why now. Investors asked for a hiring plan alongside sales and marketing plans. Use of funds turns the ₹1.5 Cr into month-wise spend tied to milestones.
T-017Job descriptionsPeople & Talent (HR) InputW0Mandatory DeepanIn progress15-Nov-26
T-018Interview kitsPeople & Talent (HR) InputW0Mandatory DeepanNot started15-Nov-26
T-019Resume screeningPeople & Talent (HR) InputW0Mandatory DeepanNot started15-Nov-26
T-020Interviews & hiring decisionsPeople & Talent (HR) InputW0Mandatory DeepanNot started15-Nov-26
T-021Vendor evaluationDelivery, Operations & Vendor Management InputW0Mandatory KrishnaIn progress15-Nov-26
Why now. Vendor progress is a concern. A scorecard decides objectively whether to continue, add a vendor, or bring work in-house.
Instructions
- Build scorecard (speed, quality, stack fit, cost, IP terms) and compare options.
- Deepan Choose.
T-022PRDs & module specsProduct Management TransformationW0Mandatory KrishnaIn progress15-Nov-26
Why now. Transformation starts with a precise description of the value to build. Module specs for Dashboard, Teams, Attendance, Reports and Admin Control Centre are the input to design, architecture and vendor SOWs.
Instructions
- Write one spec per module: purpose, users, rules, edge cases, permissions, non-goals, org-level-first defaults.
- Krishna Resolve open questions with Deepan.
- Mark every item as Phase 1 or later (feeds T-024).
T-023Super Admin portal specProduct Management TransformationW0Mandatory DeepanIn review15-Nov-26
Why now. The Super Admin spec is the baseline for design and development and is already drafted; the Super Admin screens SA-00 to SA-09 are designed in Figma. Keep spec and design in sync.
T-024Roadmap & prioritisationProduct Management TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. Building from the foundation in October for a December delivery leaves about nine weeks. Past experience shows a 6-9 month scope does not fit in 12 weeks. Phase 1 must be cut to what delivers the core value: agent capture, the six reports, client admin, consent and privacy.
Instructions
- Score every feature with RICE and estimate effort with the vendor's input.
- Propose a Phase 1 line that fits the delivery date with 20% buffer.
- Deepan + Krishna Decide the line; move the rest to Phase 2.
T-025Delivery plan & GanttDelivery, Operations & Vendor Management InputW0Mandatory PrinishaNot started15-Nov-26
Why now. Time is an input. A dependency-aware plan shows the real critical path to end of December.
T-026Risk & dependency logDelivery, Operations & Vendor Management InputW0Mandatory PrinishaNot started15-Nov-26
Why now. Blockers surface early when someone owns each dependency.
Instructions
- Build the log with owners and escalation paths.
- Prinisha Escalate and resolve.
T-027SOWs & milestone acceptanceDelivery, Operations & Vendor Management InputW0Mandatory KrishnaNot started15-Nov-26
Why now. Clear SOWs with acceptance criteria are how vendors are held to the December date.
T-028User stories & acceptance criteriaProduct Management TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. Vendors build exactly what is written. Stories with Given/When/Then criteria remove ambiguity and become the acceptance test for each milestone.
T-029User flows & journeysUI/UX Design TransformationW0Mandatory KevinNot started15-Nov-26
Why now. Flows show where users drop out before anyone draws screens: agent install, consent, first report, drill-down.
T-030Information architectureUI/UX Design TransformationW0Mandatory KevinIn progress15-Nov-26
Why now. A shared navigation model across Client Admin, Super Admin and Employee self-view prevents rework when screens multiply.
T-031System architecture & ADRsEngineering TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. Architecture fixes the shape of everything built in the next nine weeks: agent, ingestion, multi-tenant backend, three portals.
Instructions
- Draft component, data-flow and sequence diagrams and one ADR per key decision (tenancy, event transport, storage, auth).
- Vendor lead Challenge and sign off.
T-032Cloud architecture & sizingDevOps, Cloud & IT InputW0Mandatory KrishnaNot started15-Nov-26
Why now. Infrastructure is an input: it must exist before ingestion can be tested, and its cost per seat shapes margins.
T-033Metric definitionsData, Analytics & AI TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. The six reports are Teemly's core value. Each metric needs a precise, defensible definition before anyone builds a query or a chart.
Instructions
- Define Work Pulse, Focus Score, Burnout & Wellbeing signals, Tool Intelligence, Attendance and Team Leaderboard: formula, inputs, thresholds, known limitations.
- Krishna Review with Deepan; check all metrics are team or org level by default.
T-034Report logic specsProduct Management TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. Turns metric definitions into build-ready report specs: data sources, aggregation windows, filters, drill-downs and edge cases.
T-035DPDP Act gap assessmentSecurity, Privacy & Compliance TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. Privacy is part of the product, not a document added later. The DPDP assessment sets requirements for consent, retention and data rights before design and build lock in. Retention periods also differ between documents (30-day rolling vs plan-based 30/90/180 days) and must be settled here.
Instructions
- Map data flows to the DPDP Act and Rules; list gaps and product requirements.
- Counsel Legal review.
- Krishna Feed requirements into specs.
T-036Privacy-by-design reviewProduct Management TransformationW0Mandatory KrishnaNot started15-Nov-26
Why now. Org-level-first, consent and employee-controlled blur are the positioning. Catching violations at spec time avoids rework after build.
T-037Design tokensUI/UX Design LeverageW0Mandatory KevinIn progress15-Nov-26
Why now. Tokens make every later screen consistent and cheap to change, which is leverage. The Super Admin file already has a Foundations board (blue accent); align Client Admin and Employee views to the same tokens.
Instructions
- Audit tokens across Super Admin and Client Admin files; propose one shared set of Figma variables with light and dark modes.
- Kevin + Deepan Approve palette and type.
- Bind both files to the shared variables.
T-038Google Drive organisationDelivery, Operations & Vendor Management LeverageW0Mandatory PrinishaNot started15-Nov-26
Why now. One organised Drive is the single source of truth for the team and the base of the data room.
Instructions
- Propose folder structure, naming and index.
- Prinisha Approve; move sensitive files.
Done when
Drive reorganised with index.
Inputs needed
Current files.
Depends on
None. Can start now.
Unlocks
T-039Data room structureFundraising & Investor Relations InputW0Mandatory DeepanIn progress15-Nov-26
Why now. The cap table, shareholding pattern and data room are being closed with TD and Naveen now. Capital is the first input; a clean data room shortens closing.
Instructions
- Create the folder structure and index in Google Drive with a checklist of required documents and their status.
- Produce a gap list of missing or outdated items.
- Deepan Upload originals; set access per investor.
T-040Due-diligence responsesFundraising & Investor Relations InputW0Mandatory DeepanNot started15-Nov-26
Why now. Diligence questions block closing. Fast, consistent answers drawn from one set of facts avoid rework.
Instructions
- Draft answers from existing documents; flag anything unverifiable.
- Deepan Verify facts and provide missing records.
Done when
All questions answered and verified.
Inputs needed
Investor questionnaire; data room.
Depends on
T-041Personas & jobs-to-be-doneProduct Management FeedbackW0Mandatory KrishnaNot started15-Nov-26
Why now. Specs and marketing both need to know who buys (founder, HR head, ops manager) and who is affected (employees). Draft from what is known; validate in interviews.
Instructions
- Draft buyer and user personas, jobs-to-be-done and buying-committee map, labelled as hypotheses.
- Krishna Mark which claims need evidence.
T-042Weekly status reportsDelivery, Operations & Vendor Management FeedbackW0Mandatory PrinishaNot started15-Nov-26
T-043Meeting prep briefsFounder's Office & Strategy InputW0Launch-critical DeepanNot started15-Nov-26
Why now. Founder time is a scarce input. A one-page brief before investor, vendor and client meetings makes each meeting decide something.
Instructions
- Prepare a brief: background, goal, three questions to ask, likely objections, decision needed.
- Deepan Read for two minutes before the meeting; add relationship context.
Done when
Brief exists for every investor, vendor and client meeting.
Inputs needed
Meeting purpose, attendees, any prior emails or notes.
Depends on
None. Can start now.
T-044Meeting notes to action itemsFounder's Office & Strategy InputW0Launch-critical DeepanNot started15-Nov-26
Why now. Decisions that are not written down get re-made. Turning notes into owners and dates keeps the plan moving.
Instructions
- Deepan Paste notes or a transcript within 24 hours.
- Extract decisions, actions, owners and due dates; add actions to the risk/dependency log where relevant.
- Include open actions in the next weekly update.
Done when
Every key meeting has a written action list with owners.
Inputs needed
Meeting notes or transcript.
Depends on
None. Can start now.
T-045Weekly founder updateFounder's Office & Strategy InputW0Launch-critical DeepanNot started15-Nov-26
Why now. With vendors, an intern, a new hire and a CA working in parallel, one weekly update keeps everyone aligned on the same priorities.
T-046Tool stack & access policyDevOps, Cloud & IT InputW0Launch-critical KrishnaNot started15-Nov-26
Why now. Vendors and new hires need the right access on day one, and access must be removed on exit.
Instructions
- Build the tool stack list, access matrix and joiner/leaver checklist.
- Krishna Administer accounts.
Done when
Access matrix live; checklist used for every change.
Inputs needed
Tool list; people list.
Depends on
None. Can start now.
Unlocks
T-047Vendor payment trackerFinance & Accounts InputW0Launch-critical PrinishaNot started15-Nov-26
Why now. Paying vendors only against accepted milestones protects cash and timeline.
Instructions
- Build milestone-linked payment tracker.
- Deepan Approve and pay.
T-048NDAsLegal & Company Secretarial InputW0Launch-critical DeepanNot started15-Nov-26
Why now. Vendors, candidates and prospects will see confidential material.
Instructions
- Mutual and one-way NDA templates.
- Counsel Approve template.
T-049Careers page & hiring postsPeople & Talent (HR) InputW0Launch-critical DeepanNot started15-Nov-26
Why now. A careers page and hiring posts widen the funnel beyond the known circle.
Instructions
- Careers copy and LinkedIn hiring posts.
- Deepan Post.
T-050Vendor relationshipsDelivery, Operations & Vendor Management InputW0Launch-critical DeepanNot started15-Nov-26
Why now. Vendors deliver for people they trust; relationships stay human.
Instructions
- Meeting prep.
- Deepan + Krishna Manage expectations.
Done when
Weekly vendor check-ins held.
Inputs needed
Meeting schedule.
Depends on
None. Can start now.
T-051Meeting minutes & follow-upsDelivery, Operations & Vendor Management InputW0Launch-critical PrinishaNot started15-Nov-26
Why now. Delivery meetings need written decisions and owners.
Instructions
- Minutes and action tracking.
- Prinisha Share notes.
Done when
Minutes for every delivery meeting.
Inputs needed
Notes.
Depends on
None. Can start now.
T-052Infrastructure as codeDevOps, Cloud & IT InputW1Mandatory Pune infra vendorNot started31-Dec-26
Why now. Infrastructure as code makes environments reproducible and portable between vendors.
T-053Offer & onboarding packsPeople & Talent (HR) InputW1Mandatory DeepanNot started31-Dec-26
T-054WireframesUI/UX Design TransformationW1Mandatory KevinNot started31-Dec-26
Why now. Wireframes are the cheapest place to fix layout problems on the Client Admin and Employee views still to be designed.
T-055Database designEngineering TransformationW1Mandatory KrishnaNot started31-Dec-26
Why now. The schema determines report speed and retention compliance.
T-056API contractsEngineering TransformationW1Mandatory KrishnaNot started31-Dec-26
Why now. Frozen API contracts let agent, backend and frontend teams work in parallel without blocking each other.
T-057Core servicesEngineering TransformationW1Mandatory Dev vendorNot started31-Dec-26
Why now. Auth, RBAC, tenants, teams and policies are the base every feature sits on.
T-058Event ingestion pipelineEngineering TransformationW1Mandatory Dev vendorNot started31-Dec-26
Why now. Ingestion of the 60-second event stream is the pipe all value flows through; it must not lose data.
T-059Agent coreEngineering TransformationW1Mandatory C#/.NET developer (hire)Not started31-Dec-26
Why now. The OS-level agent is the source of every signal. Its footprint and reliability decide whether IT teams accept it.
Instructions
- Write the Windows service: app/URL activity, idle detection, batching, offline cache.
- Developer Build and test on real Windows machines.
T-060Screenshot & privacy controlsEngineering TransformationW1Mandatory C#/.NET developer (hire)Not started31-Dec-26
Why now. Employee-controlled blur and consent gating are what make Teemly trustworthy rather than intrusive.
T-061Code reviewEngineering TransformationW1Mandatory KrishnaNot started31-Dec-26
Why now. With vendor and in-house code merging fast, review is the quality gate that protects the December date.
Instructions
- Review every PR for bugs, security and performance with suggested fixes.
- Krishna Make merge decisions.
Done when
No PR merged without review.
Inputs needed
Repository access (attach in this session).
Depends on
None. Can start now.
T-062Vendor code auditsEngineering TransformationW1Mandatory KrishnaNot started31-Dec-26
Why now. Independent review of vendor deliveries against acceptance criteria protects money and timeline.
T-063CI/CD pipelinesDevOps, Cloud & IT TransformationW1Mandatory KrishnaNot started31-Dec-26
Why now. Automated build, test and deploy is what makes weekly releases safe.
T-064Test strategy & planQA & Testing TransformationW1Mandatory BharathNot started31-Dec-26
T-065Test casesQA & Testing TransformationW1Mandatory BharathNot started31-Dec-26
T-066Unit & integration testsQA & Testing TransformationW1Mandatory Dev teamNot started31-Dec-26
T-067Bug triage & reportsQA & Testing TransformationW1Mandatory BharathNot started31-Dec-26
Why now. A clean, prioritised bug list keeps the team on what matters for release.
Instructions
- De-duplicate, prioritise and write repro steps.
- Bharath Final severity call.
T-068SQL & data modelsData, Analytics & AI TransformationW1Mandatory Dev vendorNot started31-Dec-26
Why now. Queries and aggregation tables turn raw events into the six reports.
T-069Activity classificationData, Analytics & AI TransformationW1Mandatory KrishnaNot started31-Dec-26
Why now. Productivity classification feeds most reports. Start rules-first, then add ML where evidence supports it.
T-070Threat modellingSecurity, Privacy & Compliance TransformationW1Mandatory KrishnaNot started31-Dec-26
T-071Secure code reviewSecurity, Privacy & Compliance TransformationW1Mandatory KrishnaNot started31-Dec-26
T-072Vendor deliverable reviewDelivery, Operations & Vendor Management TransformationW1Mandatory KrishnaNot started31-Dec-26
T-073Code signing & Microsoft StoreEngineering TransmissionW1Mandatory DeepanNot started15-Dec-26
Why now. Lead-time item. An installer without a trusted signature triggers Windows warnings that IT teams reject. Code-signing certificates and Microsoft Partner Center company accounts need a registered organisation and verification that can take weeks.
Instructions
- Prepare the certificate options, Partner Center checklist and Store listing text.
- Deepan Buy the certificate, complete identity verification, open the Partner Center account.
T-074Installer & auto-updateEngineering TransformationW1Mandatory C#/.NET developer (hire)Not started31-Dec-26
Why now. Customers deploy to many machines at once; silent install and auto-update decide time-to-value.
T-075Synthetic demo datasetsData, Analytics & AI TransmissionW1Mandatory KrishnaNot started31-Dec-26
Why now. Realistic demo data powers tests, screenshots and sales demos before real customers exist.
T-076ICP & segmentationSales & Business Development TransmissionW1Mandatory NaveenIn progress31-Dec-26
Why now. Every reach activity (website, content, outbound, ads) depends on who exactly we are trying to reach. Sharpen the ICP before producing any GTM asset.
Instructions
- Define ICP by vertical (IT services, digital agencies, BPO/KPO, accounting), size band, pains and trigger events; rank segments by reachability and value.
- Naveen + Deepan Validate against real deals; pick the launch segment.
T-077Pricing analysisFinance & Accounts ConversionW1Mandatory DeepanNot started31-Dec-26
Why now. Three different price sets exist: the investor deck (₹499 / ₹699 / ₹899, $5 / $7 / $11, Enterprise floor ₹750+ which sits below Premium), the Super Admin sample data (₹299 / ₹499 / ₹749), and earlier materials (₹599 / ₹999 / ₹1,499). Website, proposals, ROI calculators and the financial model cannot be finished until one set is locked.
Instructions
- Compare the three sets on margin, competitiveness and ARPU; recommend one with plan limits and the Enterprise floor fixed.
- Deepan Lock pricing and plan limits.
- Update every document that carries a price.
T-078Privacy notice & consent textsSecurity, Privacy & Compliance RetentionW1Mandatory KrishnaNot started31-Dec-26
Why now. Employees must see clear consent copy inside the agent and portal. The agent cannot ship without it.
T-079Component libraryUI/UX Design LeverageW1Mandatory KevinIn progress31-Dec-26
Why now. The Super Admin file has a strong component set. Reusing it across portals is the main design leverage.
Instructions
- Publish the components as a shared library; add any missing pieces needed by Client Admin and Employee views (filters, report cards, consent banners).
- Kevin Review consistency.
T-080High-fidelity screensUI/UX Design TransformationW1Mandatory KevinIn progress31-Dec-26
Why now. Super Admin (SA-00 to SA-09) is designed. The Client Admin portal and the Employee self-view must reach the same standard before the vendor builds them.
Instructions
- Build high-fidelity screens module by module in Figma using the shared library.
- Kevin + Deepan Art-direct and polish each module before moving on.
- Note The Figma Starter plan hit its usage limit during the Super Admin build; upgrading the plan removes this bottleneck.
T-081Report & chart componentsUI/UX Design TransformationW1Mandatory KevinNot started31-Dec-26
Why now. The report charts are what customers pay for. They need one accessible visual language.
T-082Clickable prototypesUI/UX Design TransformationW1Mandatory KevinNot started31-Dec-26
Why now. A clickable prototype lets sales demo and lets prospects react before the product is live.
T-083Design to codeUI/UX Design TransformationW1Mandatory BharathNot started31-Dec-26
Why now. Converting approved frames directly into React components that reuse tokens shortens the build.
T-084UI components & pagesEngineering TransformationW1Mandatory BharathNot started31-Dec-26
T-085Data wiring & formsEngineering TransformationW1Mandatory BharathNot started31-Dec-26
T-086Report & dashboard UIEngineering TransformationW1Mandatory BharathNot started31-Dec-26
T-087Monthly MISFinance & Accounts InputW1Launch-critical DeepanNot started31-Dec-26
T-088Backlog hygieneProduct Management TransformationW1Launch-critical KrishnaNot started31-Dec-26
Why now. A clean backlog keeps vendor sprints flowing and stops scope creep.
Instructions
- Split, de-duplicate and rewrite tickets weekly (directly once Jira/Linear is connected).
- Krishna Run sprint planning.
T-089States & responsive variantsUI/UX Design TransformationW1Launch-critical KevinIn progress31-Dec-26
Why now. Empty, loading, error and permission states are where first impressions break.
Instructions
- Add states and responsive variants for every Phase 1 screen.
- Kevin Spot-check.
T-090Icons & illustrationsUI/UX Design TransformationW1Launch-critical KevinIn progress31-Dec-26
Why now. The Super Admin file uses Phosphor icons; extend the same set rather than mixing styles.
Instructions
- Add missing icons and spot illustrations in brand colours.
- Kevin Approve.
T-091Jobs & notificationsEngineering TransformationW1Launch-critical Dev vendorNot started31-Dec-26
T-092Debugging & refactoringEngineering TransformationW1Launch-critical Dev teamNot started31-Dec-26
Why now. Fast root-cause analysis keeps velocity up.
Instructions
- Find root cause and write the fix.
- Developer Reproduce and verify.
Done when
Fix merged with a regression test.
Inputs needed
Logs, stack traces, repro steps.
Depends on
None. Can start now.
T-093End-to-end browser testsQA & Testing TransformationW1Launch-critical BharathNot started31-Dec-26
T-094Brand guidelinesMarketing TransmissionW1Launch-critical DeepanNot started31-Dec-26
Why now. Every reach asset should look and sound like one company. The 8-Pillar Foundation document already defines the colours and logo; codify them before producing assets.
Instructions
- Write brand guidelines (logo use, colour, type, tone of voice, do's and don'ts) and publish as a Design System artifact and PDF.
- Deepan Approve.
T-095Website copyMarketing TransmissionW1Launch-critical DeepanIn progress31-Dec-26
Why now. The website is the main reach channel at launch and is being redesigned now as an enterprise-grade, global site.
Instructions
- Write copy page by page, starting with home; keep "workforce/organisational intelligence" positioning, never "monitoring".
- Deepan Approve messaging page by page.
T-096Page designMarketing TransmissionW1Launch-critical KevinIn progress31-Dec-26
T-097Design System referenceUI/UX Design LeverageW1Launch-critical KevinNot started31-Dec-26
Why now. One browsable reference lets developers build consistently without asking.
Instructions
- Create the Design System artifact with tokens, components and usage rules.
- Kevin Keep current.
Done when
Reference published and linked from the repo.
Inputs needed
Shared library; tokens.
Depends on
T-098Technical documentationEngineering LeverageW1Launch-critical KrishnaNot started31-Dec-26
Why now. Documentation lets a new hire or a new vendor become productive without the founder.
T-099Recurring automationsDelivery, Operations & Vendor Management LeverageW1Launch-critical PrinishaNot started31-Dec-26
Why now. Automating the weekly digest, competitor watch and KPI refresh gives founder time back.
Instructions
- Set up scheduled tasks.
- Prinisha Review outputs.
T-100Company KPI dashboardFounder's Office & Strategy FeedbackW1Launch-critical DeepanNot started31-Dec-26
Why now. The founder needs one view of build progress, burn, hiring and launch readiness to see which pillar is the current constraint.
Instructions
- Build a Dashboard with one section per active pillar and the OKR key results.
- Krishna/Deepan Supply numbers weekly (a sheet in Drive).
- Refresh and highlight anything off track.
T-101Monthly investor updateFundraising & Investor Relations InputW1Launch-critical DeepanNot started31-Dec-26
Why now. Monthly reporting to TD is an obligation once money arrives, and builds the trust needed for follow-on capital.
T-102Research plan & interview guidesProduct Management FeedbackW1Launch-critical KrishnaNot started31-Dec-26
Why now. The 10 pipeline prospects are the fastest source of evidence for report logic, pricing and onboarding. Interview them while the product is being built.
T-103Insight synthesisProduct Management FeedbackW1Launch-critical KrishnaNot started31-Dec-26
Why now. Raw notes only help once patterns are visible and fed back into specs, pricing and messaging.
Instructions
- Cluster themes, pains and quotes; map each to a spec, pricing or messaging change.
- Krishna Validate themes; update specs.
Done when
Insight report with changes applied to specs.
Inputs needed
Interview notes or transcripts.
Depends on
T-104Trademark searchLegal & Company Secretarial CompoundingW1Launch-critical DeepanNot started31-Dec-26
Why now. The Teemly name is a compounding asset; file before public launch to avoid a forced rename.
Instructions
- Preliminary search and class recommendation (software and SaaS classes).
- Trademark attorney File.
T-105Laptop & device setupDevOps, Cloud & IT InputW1Strengthen KrishnaNot started31-Dec-26
Why now. Standard setup saves days for each new developer.
Instructions
- Write setup scripts and checklist.
- Team Run on devices.
T-106Expense categorisationFinance & Accounts InputW1Strengthen DeepanNot started31-Dec-26
Why now. Clean categorisation feeds MIS and burn accuracy.
Instructions
- Categorise and flag anomalies.
- Deepan Reconcile.
T-107Learning & developmentPeople & Talent (HR) InputW1Strengthen KrishnaNot started31-Dec-26
Why now. A tech onboarding curriculum lets Bharath and new hires grow without senior peers on site.
Instructions
- Curricula and training content.
- Krishna Deliver.
T-108Fast option explorationUI/UX Design TransformationW1Strengthen KevinNot started31-Dec-26
Why now. Comparing two or three directions is faster than iterating on one, for screens where the right layout is not obvious.
Instructions
- Produce 2-3 directions side by side on the Design canvas.
- Deepan Choose.
Done when
Direction chosen for each contested screen.
Inputs needed
Wireframe of the screen.
Depends on
T-109Exploratory testing of web portalsQA & Testing TransformationW2Mandatory BharathNot started15-Jan-27
T-110Agent device testingQA & Testing TransformationW2Mandatory C#/.NET developer (hire)Not started15-Jan-27
Why now. The agent must work on the Windows versions and hardware customers use, within footprint limits. This needs real devices.
T-111Release readinessQA & Testing TransformationW2Mandatory KrishnaNot started31-Dec-26
Why now. One go/no-go checklist turns many test activities into one release decision.
T-112Sales deck & demo scriptSales & Business Development ConversionW2Mandatory NaveenNot started15-Jan-27
T-113Demo environment dataSales & Business Development ConversionW2Mandatory KrishnaNot started15-Jan-27
T-114Invoice & quote templatesFinance & Accounts ConversionW2Mandatory SathyaNot started15-Jan-27
T-115Proposals & quotationsSales & Business Development ConversionW2Mandatory NaveenNot started15-Jan-27
T-116Customer contractsLegal & Company Secretarial ConversionW2Mandatory Legal counselNot started15-Jan-27
T-117Data Processing AgreementSecurity, Privacy & Compliance ConversionW2Mandatory Legal counselNot started15-Jan-27
T-118Agent deployment guideCustomer Success & Support RetentionW2Mandatory KrishnaNot started15-Jan-27
Why now. No install, no value. IT admins need a mass-deployment guide (Intune/GPO), firewall rules and troubleshooting before the first pilot.
Instructions
- Write the deployment guide.
- Krishna Validate on a pilot client setup.
Done when
Guide used successfully by first pilot's IT team.
Inputs needed
Installer; tested switches.
Depends on
T-119Design QA & accessibility auditUI/UX Design TransformationW2Launch-critical KevinNot started15-Jan-27
Why now. The build must match design and be accessible before customers see it.
Instructions
- Compare build vs design; check WCAG contrast, focus order, text sizes; log issues.
- Kevin + Bharath Prioritise and fix.
Done when
No high-severity design or accessibility issues at release.
Inputs needed
Staging URL; Figma file.
Depends on
T-120UAT kits for pilot clientsQA & Testing TransformationW2Launch-critical KrishnaNot started15-Jan-27
Why now. Pilot clients sign off faster with a clear UAT script.
Instructions
- Write UAT scripts, sign-off sheets, feedback forms.
- Krishna Run sessions with clients.
T-121Performance & load testsQA & Testing TransformationW2Launch-critical Dev vendorNot started15-Jan-27
Why now. Ingestion and report APIs must handle launch volumes.
Instructions
- Write k6/JMeter scripts and analyse results.
- Vendor Run against real infrastructure.
T-122Product mockupsMarketing TransmissionW2Launch-critical KevinNot started15-Jan-27
T-123Brochures & sell sheetsMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
T-124Keyword & topic researchMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
T-125Blog & thought leadershipMarketing TransmissionW2Launch-critical DeepanNot started31-Jan-27
Why now. Articles build search visibility and give sales something to share.
T-126AEO / GEO optimisationMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
Why now. Buyers increasingly ask AI assistants for tool recommendations; content must be easy for them to quote.
T-127Content calendarMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
T-128Social creatives & carouselsMarketing TransmissionW2Launch-critical KevinNot started15-Jan-27
T-129Post copy & hooksMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
T-130Publishing & schedulingMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
T-131Landing page buildMarketing TransmissionW2Launch-critical BharathIn progress10-Jan-27
T-132Technical SEO auditMarketing TransmissionW2Launch-critical BharathNot started15-Jan-27
Why now. A technical audit before launch avoids indexing and speed problems.
Instructions
- Audit meta tags, headings, speed, links, indexation.
- Bharath Fix.
T-133Schema markupMarketing TransmissionW2Launch-critical BharathNot started15-Jan-27
Why now. Structured data helps search engines and AI answers describe Teemly correctly.
Instructions
- Write JSON-LD for Organization, SoftwareApplication, Product, FAQ, Article.
- Bharath Deploy.
T-134Scripts & storyboardsMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
T-135Press releases & media pitchesMarketing TransmissionW2Launch-critical DeepanNot started15-Jan-27
Why now. A launch announcement creates a moment for outreach and press.
Instructions
- Draft press release and media pitches.
- Deepan Approve and send.
T-136Lead list researchSales & Business Development TransmissionW2Launch-critical NaveenNot started15-Jan-27
Why now. Outbound needs a list of real accounts and decision makers in the launch segment.
T-137Security questionnairesSecurity, Privacy & Compliance ConversionW2Launch-critical KrishnaNot started15-Jan-27
T-138Account research briefsSales & Business Development ConversionW2Launch-critical NaveenNot started15-Jan-27
Why now. Prepared sellers convert more.
Instructions
- Write pre-call briefs.
- Naveen Read before the call.
T-139ROI calculatorsSales & Business Development ConversionW2Launch-critical NaveenNot started15-Jan-27
T-140Objection handling guideSales & Business Development ConversionW2Launch-critical NaveenNot started15-Jan-27
Why now. Privacy, price, employee trust and IT approval are the predictable objections; answers must match the privacy texts exactly.
T-141Email & LinkedIn sequencesSales & Business Development TransmissionW2Launch-critical NaveenNot started15-Jan-27
T-142Discount & approval matrixSales & Business Development ConversionW2Launch-critical DeepanNot started15-Jan-27
Why now. Guardrails stop discounting from eroding price before it is proven.
Instructions
- Draft discount bands and approvals.
- Deepan Set policy.
T-143Release notes & changelogProduct Management RetentionW2Launch-critical KrishnaNot started15-Jan-27
Why now. Customers adopt what they understand. Clear release notes reduce support load from day one.
Instructions
- Write customer-facing and internal notes.
- Krishna Review.
Done when
Notes published with every release.
Inputs needed
Merged changes per release.
Depends on
T-144Monitoring & alertingDevOps, Cloud & IT RetentionW2Launch-critical Pune infra vendorNot started15-Jan-27
T-145Backup & disaster recoveryDevOps, Cloud & IT RetentionW2Launch-critical Pune infra vendorNot started15-Jan-27
Why now. Customer data must be recoverable; enterprise buyers will ask.
Instructions
- Write backup policy, RPO/RTO targets and restore runbooks.
- Vendor Run a restore drill.
Done when
Successful restore drill recorded.
Inputs needed
Environments; retention policy.
Depends on
T-146Production deploys & incidentsDevOps, Cloud & IT RetentionW2Launch-critical KrishnaNot started15-Jan-27
Why now. Production changes and incidents need a rehearsed procedure and a person on call.
T-147Data-rights request processSecurity, Privacy & Compliance RetentionW2Launch-critical KrishnaNot started15-Jan-27
Why now. Access and erasure requests must be answerable within the law's timelines.
Instructions
- Write workflow and templates.
- Krishna Operate.
T-148Onboarding playbookCustomer Success & Support RetentionW2Launch-critical CS lead (to hire)Not started15-Jan-27
Why now. Time-to-value decides whether pilots convert. A day-0 to day-30 plan makes it repeatable.
T-149Employee communication kitCustomer Success & Support RetentionW2Launch-critical KrishnaNot started15-Jan-27
Why now. Employees accept Teemly when it is announced transparently. This kit protects trust and supports consent.
Instructions
- Draft announcement, FAQ and consent explainer for client staff.
- Client HR Approve and send.
T-150Training materialsCustomer Success & Support RetentionW2Launch-critical CS lead (to hire)Not started15-Jan-27
Why now. Admins and managers need to read reports correctly to get value.
Instructions
- Training decks, quick-reference cards and video scripts.
- CS lead Deliver training.
T-151Help centre articlesCustomer Success & Support RetentionW2Launch-critical CS lead (to hire)Not started15-Jan-27
T-152Support macros & templatesCustomer Success & Support RetentionW2Launch-critical CS lead (to hire)Not started15-Jan-27
T-153Competitor intelligenceFounder's Office & Strategy FeedbackW2Launch-critical DeepanNot started15-Jan-27
Why now. Positioning, battlecards and the website all need a current view of ActivTrak, Hubstaff, Teramind and others. A v1 was verified for the investor deck; it needs a launch-time refresh and then a monthly watch.
Instructions
- Refresh the feature and pricing matrix from live sources, with links and dates.
- Set up a monthly scheduled task that flags price changes, launches and notable reviews.
- Deepan Add field notes from sales calls each month.
Done when
Dated matrix with sources, and a monthly scheduled watch running.
Inputs needed
Earlier verified competitor data; any competitor names prospects mention.
Depends on
None. Can start now.
Unlocks
T-154Competitive battlecardsSales & Business Development ConversionW2Launch-critical NaveenNot started15-Jan-27
Why now. Prospects will compare Teemly to ActivTrak, Hubstaff and Teramind.
Instructions
- Write battlecards with positioning, landmines and proof points.
- Naveen Field-validate.
T-155AI-generated imageryUI/UX Design TransmissionW2Strengthen KevinNot started15-Jan-27
Why now. Imagery for marketing and empty states, generated inside Figma (uses Figma AI credits).
Instructions
- Generate options in Figma.
- Kevin Select and approve; check usage rights.
T-156Motion graphicsMarketing TransmissionW2Strengthen KevinNot started15-Jan-27
Why now. Motion makes the explainer clearer.
Instructions
- Build animated sequences in Figma; export MP4.
- Kevin Polish timing; add music and voice-over.
T-157Media & event researchMarketing TransmissionW2Strengthen DeepanNot started15-Jan-27
Why now. The right events and journalists multiply founder effort.
Instructions
- Research journalists, publications, HR-tech events.
- Deepan Build relationships.
T-158Discovery calls, demos, closingSales & Business Development ConversionW3Mandatory NaveenNot started31-Mar-27
Why now. This is where the plan's outcome happens: converting pipeline prospects into paid pilots after launch.
T-159Sending & follow-upsSales & Business Development TransmissionW3Launch-critical NaveenNot started31-Mar-27
Why now. Sending and following up is where outbound succeeds or fails. No email or CRM is connected yet, so this stays mostly human.
T-160Contract first-pass reviewSales & Business Development ConversionW3Launch-critical NaveenNot started31-Mar-27
Why now. Customer redlines need a fast first pass.
Instructions
- Flag risky clauses and suggest redlines.
- Counsel Sign off.
T-161Pipeline reportingSales & Business Development FeedbackW3Launch-critical NaveenNot started31-Mar-27
Why now. Pipeline and win/loss data show which objections and segments to fix.
Instructions
- Weekly pipeline and win/loss report.
- Naveen Keep records updated.
T-162Advisor & board packsFounder's Office & Strategy InputW3Strengthen DeepanNot started31-Mar-27
Why now. Once investors are in, a short quarterly pack keeps trust high and makes the next round easier.
Instructions
- Draft a 10-slide pack from the dashboard and MIS.
- Deepan Own the narrative and final numbers.
T-163Pitch deck build & updatesFundraising & Investor Relations InputW3Strengthen DeepanNot started31-Mar-27
Why now. The 21-slide investor deck exists. Refresh it once launch data exists, for the long-term investors Senthil is bringing.
Instructions
- Update traction, pricing and use-of-funds slides; keep Teemly branding.
- Deepan Approve every number.
T-164Teaser & executive summaryFundraising & Investor Relations InputW3Strengthen DeepanNot started31-Mar-27
T-165Investor Q&A and objection prepFundraising & Investor Relations InputW3Strengthen DeepanNot started31-Mar-27
Why now. The Q&A and objection guide exists. Update it with launch evidence so answers rely on data, not projections.
T-166Investor proposal variantsFundraising & Investor Relations InputW3Strengthen DeepanNot started31-Mar-27
Why now. Senthil's investors want two proposal types: debt-based, and long-term equity plus asset holding. Both need clear terms side by side.
T-167ESOP policyLegal & Company Secretarial InputW3Strengthen DeepanNot started31-Mar-27
Why now. An ESOP pool helps attract senior engineers once the team grows.
Instructions
- Draft ESOP plan and grant letters.
- Counsel + Sathya Finalise.
T-168HR policies & handbookPeople & Talent (HR) InputW3Strengthen DeepanNot started31-Mar-27
Why now. Policies matter more as the team grows.
Instructions
- Draft leave, remote, conduct, IT use and POSH policies.
- Counsel Check; adopt.
Done when
Handbook adopted.
Inputs needed
Founder preferences.
Depends on
None. Can start now.
T-169Performance frameworkPeople & Talent (HR) InputW3Strengthen DeepanNot started31-Mar-27
Why now. Clear goals and reviews keep people aligned to the OKRs.
Instructions
- Goal templates, review forms, career ladders.
- Deepan Run reviews.
T-170Code to FigmaUI/UX Design TransformationW3Strengthen KevinNot started31-Mar-27
Why now. Pushing built pages back into Figma keeps the design file truthful after launch changes.
Instructions
- Push pages into Figma for side-by-side review.
- Kevin Review differences.
T-171Anomaly & burnout signalsData, Analytics & AI TransformationW3Strengthen KrishnaNot started31-Mar-27
Why now. Burnout and anomaly signals need real baseline data. Building them before launch would mean guessing.
Instructions
- Build baselines and team/org-level alert logic.
- Krishna Validate on real data; ethics review.
Done when
Signals validated on pilot data.
Inputs needed
6-8 weeks of real usage data.
Depends on
T-172Penetration testingSecurity, Privacy & Compliance TransformationW3Strengthen KrishnaNot started31-Mar-27
Why now. An external pen test is expected by enterprise buyers.
Instructions
- Write scope and RFP; track remediation.
- External firm Perform the test.
T-173Event & print collateralMarketing TransmissionW3Strengthen KevinNot started31-Mar-27
Why now. Print collateral is needed only when events are booked.
Instructions
- Design standees and booth panels.
- Kevin Final proof; printing.
T-174Whitepapers & e-booksMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
Why now. Gated long-form content captures leads once there is traffic.
Instructions
- Write whitepapers or e-books.
- Deepan Approve claims.
T-175Case studiesMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
T-176NewsletterMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
Why now. A newsletter keeps prospects warm between conversations.
Instructions
- Draft monthly on a schedule.
- Deepan Approve and send.
T-177Webinar contentMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
Why now. Webinars convert interest into demos.
Instructions
- Deck, script, promo and follow-up emails.
- Deepan Present live.
T-178Community engagementMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
Why now. Replies build relationships; they need a person.
Instructions
- Draft replies.
- Deepan Engage personally.
T-179Ad copy & creative variantsMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
T-180Campaign planMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
T-181Campaign launch & spendMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
T-182Filming, voice-over, editingMarketing TransmissionW3Strengthen DeepanNot started31-Mar-27
Why now. Live video needs filming and editing.
Instructions
- Shot list and edit notes.
- Team Film, record, edit.
T-183Personalised openers at scaleSales & Business Development TransmissionW3Strengthen NaveenNot started31-Mar-27
Why now. Personalised first lines lift reply rates once volume grows.
Instructions
- Write account-specific openers from research.
- Naveen Spot-check.
T-184RFP & tender responsesSales & Business Development ConversionW3Strengthen DeepanNot started31-Mar-27
Why now. Government and public-sector tenders are a separate track once the product and compliance pack exist.
Instructions
- Draft responses and compliance matrices.
- Deepan Eligibility documents; signatures.
T-185ISO 27001 policy setSecurity, Privacy & Compliance RetentionW3Strengthen KrishnaIn progress31-Mar-27
T-186Ticket triage & reply draftsCustomer Success & Support RetentionW3Strengthen CS lead (to hire)Not started31-Mar-27
T-187Customer health scoreCustomer Success & Support RetentionW3Strengthen CS lead (to hire)Not started31-Mar-27
T-188Business reviews (QBRs)Customer Success & Support RetentionW3Strengthen CS lead (to hire)Not started31-Mar-27
T-189Code Connect mappingUI/UX Design LeverageW3Strengthen BharathNot started31-Mar-27
T-190IntegrationsEngineering LeverageW3Strengthen Dev vendorNot started31-Mar-27
Why now. SSO and HRMS integrations deepen adoption and switching cost, but are not needed for the first pilots.
Instructions
- Build connectors for Google/Microsoft SSO, then HRMS and Slack/Teams.
- Vendor Test with partner sandboxes.
Done when
SSO live; next integration chosen by customer demand.
Inputs needed
Partner credentials; customer demand.
Depends on
T-191Teemly AI assistantData, Analytics & AI LeverageW3Strengthen KrishnaNot started31-Mar-27
Why now. The AI assistant multiplies the value of the reports, but only once the reports are reliable. AI-native is a roadmap claim, not a launch claim.
T-192SOPs & process docsDelivery, Operations & Vendor Management LeverageW3Strengthen PrinishaNot started31-Mar-27
Why now. Written SOPs make releases, onboarding and support repeatable as the team grows.
Instructions
- Write SOPs.
- Team Adopt.
Done when
SOPs for release, onboarding, support.
Inputs needed
Current practice.
Depends on
None. Can start now.
T-193AI evaluationData, Analytics & AI FeedbackW3Strengthen KrishnaNot started31-Mar-27
Why now. Without evals, AI quality silently drifts.
Instructions
- Build test sets, rubrics and regression evals.
- Krishna Review failure cases.
T-194Ad-hoc analysisData, Analytics & AI FeedbackW3Strengthen DeepanNot started31-Mar-27
Why now. Specific questions answered from data beat opinions.
Instructions
- Analyse and chart.
- Deepan Act on it.
Done when
Answer delivered with method.
Inputs needed
A question and a data export.
Depends on
None. Can start now.
T-195AI search visibility trackingMarketing FeedbackW3Strengthen DeepanNot started31-Mar-27
Why now. Shows whether AI assistants and search describe Teemly correctly, and where competitors are cited instead.
Instructions
- Run a monthly scheduled check of answers to 20 target questions; report changes.
- Deepan Act on findings.
Done when
Monthly visibility report running.
Inputs needed
Target questions buyers ask.
Depends on
T-196Social analyticsMarketing FeedbackW3Strengthen DeepanNot started31-Mar-27
Why now. Social data shows which messages reach the ICP.
Instructions
- Monthly report with what to do more and less of.
- Deepan Export data.
T-197A/B test variantsMarketing FeedbackW3Strengthen DeepanNot started31-Mar-27
Why now. Experiments replace opinion on headline and CTA once traffic exists.
Instructions
- Write variants and a test plan.
- Deepan Run test; decide.
Done when
First test concluded with a decision.
Inputs needed
Traffic; conversion goal.
Depends on
T-198Performance analysisMarketing FeedbackW3Strengthen DeepanNot started31-Mar-27
Why now. Spend should move toward what converts.
Instructions
- Weekly analysis and recommendations.
- Deepan Decide changes.
T-199Feedback & churn analysisCustomer Success & Support FeedbackW3Strengthen KrishnaNot started31-Mar-27
Why now. Feedback and churn reasons feed the roadmap.
Instructions
- Theme analysis with recommended fixes.
- Krishna Prioritise fixes.
T-200SaaS metricsFinance & Accounts FeedbackW3Strengthen DeepanNot started31-Mar-27
T-201Internal dashboardsData, Analytics & AI FeedbackW3Strengthen KrishnaNot started31-Mar-27
Why now. Usage, conversion and support dashboards show where the loop is leaking.
Instructions
- Build internal dashboards.
- Team Supply exports.
T-202Market sizing (TAM / SAM / SOM)Founder's Office & Strategy InputW4Later DeepanNot started30-Jun-27
Why now. Market sizing already exists in the investor deck. It only needs a refresh when Series A preparation starts, using real conversion data.
Instructions
- Rebuild bottom-up sizing using real ARPU and segment conversion; cite every source.
- Deepan Approve method and figures.
Done when
Refreshed TAM/SAM/SOM with sources, labelled estimates.
Inputs needed
Actual customer and pricing data from the first two quarters.
Depends on
T-203Investor research & target listFundraising & Investor Relations InputW4Later DeepanNot started30-Jun-27
Why now. Series A follows traction. Build the investor list once there are real metrics to show.
T-204Outreach & follow-up draftsFundraising & Investor Relations InputW4Later DeepanNot started30-Jun-27
T-205Pitch meetings & negotiationFundraising & Investor Relations InputW4Later DeepanNot started30-Jun-27
T-206Legal opinions & disputesLegal & Company Secretarial InputW4Later Legal counselNot started30-Jun-27
Why now. Legal opinions and disputes are human work.
Instructions
- Background research.
- Counsel Advise.
Done when
Matter resolved.
Inputs needed
Matter details.
Depends on
None. Can start now.
T-207Partner programme designSales & Business Development TransmissionW4Later DeepanNot started30-Jun-27
Why now. Channel partners (HR consultants, IT resellers, Zoho partners) are the Year 2 route to reach without 10x founder effort, once onboarding is repeatable.
T-208Partner enablement kitSales & Business Development TransmissionW4Later DeepanNot started30-Jun-27
Why now. Partners sell only what they understand.
Instructions
- Build partner deck, training guide and co-branded collateral.
- Deepan Train partners.
T-209SOC 2 readinessSecurity, Privacy & Compliance RetentionW4Later KrishnaNot started30-Jun-27
Why now. SOC 2 matters when US enterprise buyers ask for it.
Instructions
- Map controls and gaps.
- Team Implement; auditor.
T-210Audit evidence collectionSecurity, Privacy & Compliance RetentionW4Later KrishnaNot started30-Jun-27
Why now. Audits need evidence collected continuously, not at the last minute.
Instructions
- Build evidence checklist and folders.
- Team Collect evidence from systems.
T-211Renewals & upsellCustomer Success & Support RetentionW4Later DeepanNot started30-Jun-27
Why now. Renewals and upsells follow proven value.
Instructions
- Renewal reminders and proposal drafts.
- Deepan Negotiate.
T-212In-app help assistant knowledge baseCustomer Success & Support LeverageW4Later KrishnaNot started30-Jun-27
Why now. An in-app help assistant scales support without headcount, once the help centre is mature.
Instructions
- Structure knowledge base and guardrails.
- Krishna Approve answers.
T-213Benchmark reportsData, Analytics & AI CompoundingW4Later DeepanNot started30-Jun-27
Why now. Anonymised benchmarks become an asset that grows with every customer, subject to consent and contracts.
T-214Award & speaker applicationsMarketing CompoundingW4Later DeepanNot started30-Jun-27
Why now. Awards and talks compound brand trust once there are results to show.
Instructions
- Draft applications and abstracts.
- Deepan Submit; speak.
No tasks match these filters.
Full task cards are also in the Execution Playbook ↗, and live status is in the Task Delivery Tracker ↗.
Compliance roadmap, with honest status
Trust is designed into the product from the specification stage. Certifications are on the roadmap with target windows, not claimed as complete. Each track links to the tasks that deliver it.
| Track | What it covers | Status | Evidence or target | Tasks |
|---|---|---|---|---|
| Privacy by design | Org-level insights first, employee consent, employee-controlled screenshot blur, role-based access | In progress | Role-Based Access Matrix ↗ | T-036 T-060 |
| DPDP Act 2023 | Gap assessment, consent texts, DPA and a data-rights request process | In progress | Privacy & DPDP phase, EXE Agent Build Playbook ↗ | T-035 T-078 T-117 T-147 |
| India data residency | Primary cloud in AWS Mumbai (ap-south-1) | Planned | Infrastructure, Security & Compliance Guide ↗ | T-032 |
| Signed Windows agent | Code-signing certificate, Microsoft Partner Center verification, Microsoft Store listing | Planned | Packaging, signing & trust phase, EXE Agent Build Playbook ↗ | T-073 |
| Secure engineering | STRIDE threat model, security review on every pull request, release go/no-go | Planned | Security hardening phase, EXE Agent Build Playbook ↗ | T-070 T-071 T-111 |
| Independent penetration test | External firm tests the agent, ingestion and portals | Planned | Q1 2027, after launch | T-172 |
| ISO 27001 | Policy set first, then controls and certification audit | In progress | Policies Q1 2027 · certification later | T-185 |
| SOC 2 | Control mapping and readiness for US enterprise buyers | Planned | 2027, driven by US demand | T-209 T-210 |
Legal texts (privacy notice, consent, DPA) are drafted for review and signed off by counsel before use.
How progress is reported and controlled
A fixed reporting rhythm and contract controls, set up alongside the build.
- Weekly status reportStarts W0
Progress, risks and decisions from every owner, compiled every Friday.
T-042 - Starts W0
- Milestone-based vendor contractsStarts W0
Statements of work with acceptance criteria and IP assignment; payment only on accepted milestones.
T-013 T-027 - Independent code auditsStarts W1
Each vendor milestone reviewed against the spec before acceptance.
T-062 T-072 - Monthly investor updateStarts W1
Highlights, KPIs, lowlights and asks on a fixed monthly date.
T-101 - Quarterly advisor packStarts W3
KPIs, risks and asks with a full appendix.
T-162